H.R. 6088 - Streamlining Permitting Efficiencies in Energy Development Act

Introduced: 2018-06-13
Bill Status: Placed on the Union Calendar, Calendar No. 714.
 
Summary Not Available

Full Text


115th CONGRESS
2d Session
H. R. 6088


    To amend the Mineral Leasing Act to authorize notifications of permit to drill, and for other purposes.


IN THE HOUSE OF REPRESENTATIVES

June 13, 2018

    Mr. Curtis (for himself, Mr. Bishop of Utah, Mr. Gosar, Mr. Gianforte, Mr. Westerman, and Mr. Gohmert) introduced the following bill; which was referred to the Committee on Natural Resources


A BILL

    To amend the Mineral Leasing Act to authorize notifications of permit to drill, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. Short title.

This Act may be cited as the “Streamlining Permitting Efficiencies in Energy Development Act” or the “SPEED Act”.

SEC. 2. Notifications of permit to drill.

The Mineral Leasing Act is amended by—

(1) redesignating section 44 as section 45; and

(2) inserting after section 43 the following:

“SEC. 44. Notifications of permit to drill.

“(a) In general.—Not later than 1 year after the date of the enactment of this section, the Secretary shall establish procedures by which an operator may conduct drilling and production activities on available Federal land and non-Federal land after sending to the Secretary a notification of permit to drill under this section in lieu of obtaining an APD.

“(b) Content of notification.—To be considered a complete notification of permit to drill under this section, an operator shall include in the notification of permit to drill submitted under this section the following:

“(1) A notification of permit to drill form.

“(2) A surface use plan of operations.

“(3) A drilling plan.

“(4) A well plat certified by a registered surveyor.

“(5) An operator certification.

“(6) Evidence of bond coverage.

“(7) A notification of permit to drill fee in an amount to be determined by the Secretary.

“(8) Any other information required by order, notice, or regulation issued by the Secretary pursuant to this section.

“(c) Justifications for objection.—

“(1) IN GENERAL.—Except as otherwise provided in this subsection, the Secretary may not object to a notification of permit to drill under this section if the notification—

“(A) demonstrates that the drilling operations described in the notification of permit to drill will be located in—

“(i) a developed field, where there are existing oil and gas wells within a 5-mile radius and for which an approved land use plan or environmental review was prepared within the last 10 years under the National Environmental Policy Act of 1969 (42 U.S.C. 4321) that analyzed such drilling operations as a reasonably foreseeable activity;

“(ii) a location or well pad site at which drilling has occurred within 10 years before the date of spudding the well and the proposed operations do not increase the surface disturbance on the location or well pad site;

“(iii) an area consisting of individual surface disturbances of less than 10 acres and the total surface disturbance on the lease is not greater than 150 acres and for which an approved land use plan or environmental review was prepared within the last 10 years under the National Environmental Policy Act of 1969 (42 U.S.C. 4321) that analyzed such drilling operations as a reasonably foreseeable activity;

“(iv) an area consisting of Federal mineral interests that is located within the boundaries of a communitization agreement or unit agreement which contains minerals leased by a State or private mineral owner for which a drilling permit has been approved by a State regulatory agency; or

“(v) an area in which a categorical exclusion under the National Environmental Policy Act of 1969 (42 U.S.C. 4321) applies for oil and gas drilling or re-entry activities; or

“(B) includes—

“(i) an environmental review that concludes that actions described in the notification of permit to drill pose no significant effects to the human environment or threatened or endangered species; and

“(ii) an archeological review that concludes that actions described in the notification of permit to drill pose no significant effects on cultural or historic properties or resources.

“(2) ENDANGERED SPECIES PROTECTION.—

“(A) IN GENERAL.—Notwithstanding paragraph (1), the Secretary shall object to a notification of permit to drill if the activity described in such notification of permit to drill is likely to jeopardize the continued existence of a species that is a threatened species or endangered species under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) or result in the destruction or adverse modification of critical habitat of such species.

“(B) WITHDRAWAL OF OBJECTION.—The Secretary may withdraw an objection under subparagraph (A) if the operator consults with the Secretary on such objection and places conditions on the notification of permit to drill sufficient to comply with the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.).

“(3) NATIONAL HISTORIC PRESERVATION.—

“(A) IN GENERAL.—Notwithstanding paragraph (1), the Secretary shall object to a notification of permit to drill if the activity described in such notification of permit to drill is likely to affect properties listed, or eligible for listing, in the National Register of Historic Places under section 306108 of title 54, United States Code.

“(B) WITHDRAWAL OF OBJECTION.—The Secretary may withdraw an objection under subparagraph (A) if the operator consults with the Secretary on such objection and places conditions on the notification of permit to drill sufficient to comply with section 306108 of title 54, United States Code.

“(d) Objection or no action.—

“(1) NOTIFICATION OF INCOMPLETE NOTIFICATION.—Not later than 15 days after receipt of a notification of permit to drill, or a revised notification of permit to drill, from an operator under this section, if the notification of permit to drill is not complete, the Secretary shall notify the operator in writing of such.

“(2) NOTIFICATION OF OBJECTIONS.—Not later than 45 days after receipt of a complete notification of permit to drill from an operator under this section, the Secretary shall review the notification of permit to drill and—

“(A) notify the operator in writing of any objections to the notification of permit to drill; or

“(B) take no action.

“(3) NO ACTION REQUIRED.—If the Secretary has not notified an operator under either paragraph (1) or paragraph (2) within 45 days after receipt of a notification of permit to drill from the operator under this section, the operator may, without further action from the Secretary, conduct the drilling and production activities for which the notification of permit to drill was submitted.

“(4) OPPORTUNITY TO RESUBMIT NOTIFICATION.—If the Secretary notifies an operator under paragraph (1) of an incomplete notification or paragraph (2) of an objection, the Secretary shall allow the operator to address such incomplete notification or objection and revise and resubmit the notification of permit to drill.

“(5) OPPORTUNITY TO RESUBMIT NOTIFICATION AS APD.—If the Secretary notifies an operator under paragraph (2) of an objection, the Secretary shall allow the operator to resubmit such information in the form of a notification for an APD.

“(e) Notification fee.—The Secretary may not charge an operator under this section a fee for submitting a notification of permit to drill greater than the fee the Secretary charges an applicant for an APD.

“(f) Environmental review.—

“(1) IN GENERAL.—An environmental review or archeological review described in subsection (c)(1)(B) may be completed by a third-party contractor approved by the Secretary or pursuant to a memorandum of understanding between the operator and the Secretary.

“(2) FIELD WORK AUTHORIZATION.—The Secretary shall issue a field work authorization to a third-party contractor for the purposes of paragraph (1) within a reasonable time period.

“(3) REQUEST FOR CONCURRENCE.—The Secretary shall allow a third-party contractor to submit a request to the State Historic Preservation Office on behalf of the Secretary.

“(g) Additional surface use permits.—The Secretary may not require an operator that has submitted a notification of permit to drill for which the Secretary did not notice an objection to obtain a surface use permit for an action included in the notification of permit to drill.

“(h) Site inspection.—The Secretary may not require an operator that has submitted a notification of permit to drill for which the Secretary did not notice an objection to submit to a site inspection before commencement of the activities described in the notification of permit to drill.

“(i) Federal enforcement.—The Secretary may conduct inspections of and evaluate activities described in a notification of permit to drill for purposes of bringing an enforcement action. The Secretary may suspend enforcement proceedings if the operator modifies its activities to comply with the notification of permit to drill or obtains an APD for such activities.

“(j) Application of NEPA.—

“(1) NO ACTION BY SECRETARY.—The decision by the Secretary to take no action under subsection (c)(1)(B)(2) shall not constitute a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4321(2)(C)).

“(2) DEVELOPMENT OF REGULATIONS.—The development of any regulation pursuant to this section shall constitute a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4321(2)(C)).

“(k) Definitions.—In this section:

“(1) APD.—The term ‘APD’ means an application to drill or re-enter a well.

“(2) AVAILABLE FEDERAL LAND.—The term ‘available Federal land’ means Federal land that—

“(A) is located within the boundaries of a State;

“(B) is not held by the United States in trust for the benefit of a federally recognized Indian Tribe;

“(C) is not a unit of the National Park System;

“(D) is not a unit of the National Wildlife Refuge System;

“(E) is not a Congressionally-approved wilderness area under the Wilderness Act (16 22 U.S.C. 1131 et seq.); and

“(F) is managed by the Director of the Bureau of Land Management or the Director of the Forest Service.

“(3) DRILLING OPERATIONS.—The term ‘drilling operations’ means the drilling or re-entry of a well.

“(4) DRILLING PLAN.—The term ‘drilling plan’ means a plan containing—

“(A) a description of the drilling program;

“(B) the surface and projected completion zone location;

“(C) pertinent geologic data;

“(D) expected hazards;

“(E) proposed mitigation measures to address such hazards;

“(F) any other information specified in applicable notices or orders; and

“(G) any other pertinent data as the Secretary may require.

“(5) SURFACE USE PLAN OF OPERATION.—The term ‘surface use plan of operation’ means a plan containing—

“(A) the road and drillpad location;

“(B) details of pad construction;

“(C) methods for containment and disposal of waste material;

“(D) plans for reclamation of the surface;

“(E) any other information specified in applicable orders or notices; and

“(F) any other pertinent data as the Secretary may require.”.